Hiring a contractor means letting a crew you have never met work on your house for days or weeks. This page walks through how a job runs at All American Renovations, step by step: who you will talk to, who is on site, how we check the work, and what happens if something is not right.

1. From your first call to a signed contract

When you call the office, you will usually reach Caden. He takes your information and sets up a time for us to come out. Our Service Commitment page covers how fast we reply and every way to reach us, and What Happens After You Call a Contractor walks through the visit and the proposal in detail.

Before we start any project, everyone who makes decisions about it meets with us live, in person, by phone or on Zoom, to go over the scope and selections together. We do not assume everyone agrees based on emails.

2. Who is on your job

  • On gutter jobs, the lead installer is your point person on site. You can also call Caden in the office or the project director on your job at any time.
  • On every other job, Chris Sineath, our project manager, is your point person. He passes everything along to the lead man on the crew, so you are not trying to track down the right installer yourself. When work starts, Thomas walks the job with Chris so everyone is clear on exactly what is being done.

Every crew has a lead man who is responsible for the work being done right. The crews are not the same from job to job, but most of the people on them have worked with us for 5 to 15 years, including two father-and-son teams. Our gutter installers are a mix of our own employees and long-time subcontract crews. All other trades are subcontractors working under a written independent contractor agreement. Every subcontractor carries their own workers’ compensation and general liability insurance, and we carry our own on top of theirs.

For the names and the full story, read Who’s Actually Going to Be at My House?

3. Scheduling and keeping you updated

Caden schedules the crews from our Hampton office. Before work starts, he confirms exactly where you want the material, the dumpster and the portable toilet, and he lets you know as deliveries arrive.

If there is going to be a delay or a gap between trades, Chris or Caden will tell you beforehand, not after nobody shows up. The most common gap is between siding and paint. We use one painting crew we trust, and paint usually starts within about a week of the siding being finished. We would rather wait a few days for the right painter than send someone we do not know to your house.

4. How we check the work

On siding jobs, the project manager runs a written quality checklist four times during the job, not just once at the end. It covers things like nails landing in studs, flashing behind every butt joint and over windows and doors, and primed cut edges. The installers get a copy of the same checklist, so they know exactly what they will be checked on. The instruction at the top of it reads: “Walk the job like this was your own home. If it’s wrong, it needs to be fixed.”

If something is not installed to that standard, it comes down and goes back up the right way, even if that means a whole wall.

5. If something is not right during the job

Start with your point person: the lead installer, Caden or the project director on a gutter job, and Chris on everything else. They will look at it with the crew and either correct it or explain why it was done that way. If Chris cannot resolve it, he brings Thomas in, and the two of them meet with you, go over the issues and put together a plan to fix them.

Sometimes a concern turns out to be something that is installed correctly and needs explaining, like the small gaps and clearances that keep a siding warranty intact. Either way, you get a straight answer.

6. The final walkthrough and final payment

When the job is substantially complete, we let you know, and that progress payment is due before the final walkthrough. On jobs Chris manages, he schedules the walkthrough with you. The final payment is due when the walkthrough is scheduled, and the walkthrough should happen within three days of our notice that the job is complete. If it is put off beyond that, the final payment is due when you receive our invoice.

At the walkthrough, we go through the work together and make a list of anything that needs touching up. We schedule and finish those punch-out items after the walkthrough, and final payment does not wait on them. On gutter jobs, the final payment is due when the gutters are installed.

7. After the job is done

If something goes wrong after we finish, whether it is two years or twenty-five years later, call the office. Caden takes down the details and passes them to the project manager or project director, and Thomas gets involved. We will come out and investigate within one to two weeks. We would like to say we will be there tomorrow, but that is not realistic, and we would rather give you a real number.

If it is our workmanship, we fix it. If it is a product defect, we contact the manufacturer’s representative for you. Our labor warranties run from one year on interior work up to thirty years on James Hardie siding, and they start once the job is paid in full.

Ready to talk about your project?

Call the office at (770) 629-0589 or request a consultation.